Large-Scale Infrastructure Project — Generator Fleet Optimization
The Challenge
A major infrastructure contractor was running a fleet of 12 diesel generators (ranging from 150 kVA to 500 kVA) across a remote highway construction project. Fuel logistics costs were significant, and the generators were running at 30–50% load for extended periods — a highly inefficient operating condition.
The Solution
Voltox units were installed across all 12 generators over a two-day period with no operational downtime. The system began optimizing fuel delivery immediately, with full baseline calibration completed within the first 72 hours.
"The fuel savings were visible in the first billing cycle. Voltox paid for itself well ahead of schedule."
— Fleet Manager, Infrastructure Contractor